Corner instead of 180.
Rubber roof drip edge with half inch foam installation.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.
Applied with metal and standing seam roofing an open hemmed drip edge will deter water from going upward as a result of capillary action and passing the drip edge metal.
Drops maybe an inch as a vertical return and then folds 180 running back up and returning to the roof edge under the horizontal and finally drops the.
If the rubber is stretched this puts a built in stress on the seam finally roll the seam with a hand roller to get 100 adhesion then apply a bead of a special lap caulk to the edge of the seam to keep water from getting between the layers.
This is important to protect damage to your fascia soffits rafters.
Seam tape is a very sticky two sided tape that comes in a 6 inch roll with a release paper on one side.
With without rain gutters.
How to install a drip edge.
Tools supplies tin sn.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Place corner pieces where panels will meet bends at the edge of the roofing.
Around the perimeter of a roof that is not a run off point for water drip you will need to keep the water on the roof and drive it towards your drip trim.
If it doesn t pull the drip edge out slightly from under the shingles.
Use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
Pauly i have done quite a few rubber roofs on small roofs from 8x12 up to about 20x30 if you fully adhere the membrane you won t have any problems glueing directly to the drip edge as mike described the contact cement type adhesive will grab the drip edge better than the water based type either will work a new clean substrate will make the glue job much easier good luck all stephen.
Installing drip edge on your roof.
I could also imagine but i have to stop and think about how i would fold it a custom drip edge that protrudes maybe 1 2 or 3 4 beyond the roof but turns a 90 deg.
Secure the drip edge with roofing cement.
Make sure the outer edge extends over the gutter.
This will create ventilation and separation between attic roof substate and the roof itself.
Run vertical 2 3 boards battens over roof sheething 16 o c.